Indicative only. This tool encodes the demarcation values printed on the Annex II tables and the Article 4(1) scope thresholds. It is a fast first answer, not a conformity assessment: confirm any real equipment against the tables in Directive 2014/68/EU and against the applicable harmonised standard before you commit a route.
—
Which Annex II table applies
The table is chosen from three things only: the type of equipment, whether the contents are treated as a gas or a liquid, and the fluid group. A fluid counts as a gas when its vapour pressure at the maximum allowable temperature is more than 0.5 bar above atmospheric — water at a TS of 120 °C is therefore assessed as a gas.
| Equipment | Fluid group | Gas / vapour | Liquid |
|---|---|---|---|
| Vessel | Group 1 | Table 1 | Table 3 |
| Vessel | Group 2 | Table 2 | Table 4 |
| Fired or heated, steam / superheated water > 110 °C | Any | Table 5 | Table 5 |
| Piping | Group 1 | Table 6 | Table 8 |
| Piping | Group 2 | Table 7 | Table 9 |
| Safety accessory | Any | Category IV | Category IV |
| Pressure accessory | Any | Vessel or piping table, own PS and size | Vessel or piping table, own PS and size |
Article 4(1): when the directive applies at all
Below these thresholds the equipment is designed to sound engineering practice (SEP, Article 4(3)) and does not carry a PED CE marking. Above them, the equipment falls into a category and the corresponding table decides how far up it sits.
| Table | Equipment and fluid | In scope when |
|---|---|---|
| 1 | Vessel, group 1 gas | V > 1 L and PS·V > 25 bar·L, or PS > 200 bar |
| 2 | Vessel, group 2 gas | V > 1 L and PS·V > 50 bar·L, or PS > 1000 bar |
| 3 | Vessel, group 1 liquid | V > 1 L and PS·V > 200 bar·L, or PS > 500 bar |
| 4 | Vessel, group 2 liquid | PS > 10 bar and PS·V > 10 000 bar·L, or PS > 1000 bar |
| 5 | Fired or heated steam generator | V > 2 L |
| 6 | Piping, group 1 gas | DN > 25 |
| 7 | Piping, group 2 gas | DN > 32 and PS·DN > 1000 bar·mm |
| 8 | Piping, group 1 liquid | DN > 25 and PS·DN > 2000 bar·mm |
| 9 | Piping, group 2 liquid | PS > 10 bar, DN > 200 and PS·DN > 5000 bar·mm |
The category bands, table by table
The demarcation lines printed on each Annex II table, written out as values. Each line marks the upper limit of a category, so a value that sits on a line belongs to the category below it.
| Table | Diagonals / caps on the table | Category |
|---|---|---|
| 1 | PS·V 25 / 50 / 200 / 1000; PS 200; PS 1000 | I: PS·V ≤ 50 · II: ≤ 200 · III: ≤ 1000 · IV: > 1000. At V ≤ 1 L: III above 200 bar, IV above 1000 bar |
| 2 | PS·V 50 / 200 / 1000 / 3000; PS 1000; PS 3000 | I: ≤ 200 · II: ≤ 1000 · III: ≤ 3000 · IV: > 3000. At V ≤ 1 L: III above 1000 bar, IV above 3000 bar |
| 3 | PS·V 200; PS 10; PS 500 | I: above the 200 line up to PS 10 bar · II: PS 10–500 bar · III: above 500 bar, except V ≤ 1 L above 500 bar which is II |
| 4 | PS·V 10 000; PS 1000 / 500 / 10; V 10 / 1000 | I: above 1000 bar at V ≤ 10 L, and above the 10 000 line between PS 10 and 500 bar · II: above 500 bar at V > 10 L · below the staircase: out of scope. No category III or IV |
| 5 | PS·V 50 / 200 / 3000; PS 32; V 1000 | I: ≤ 50 · II: ≤ 200 · III: ≤ 3000 · IV: > 3000 or V > 1000 L |
| 6 | PS·DN 1000 / 3500; DN 25 / 100 / 350 | DN 25–100: I to 1000, II above · DN 100–350: II to 3500, III above · DN > 350: III |
| 7 | PS·DN 1000 / 3500 / 5000; DN 32 / 100 / 250 | I: to 3500 · II: to 5000 · III: above 5000 or DN > 250 |
| 8 | PS·DN 2000; PS 10; PS 500; DN 25 | I: above the 2000 line up to PS 10 bar · II: PS 10–500 bar · III: above 500 bar |
| 9 | PS·DN 5000; PS 10; PS 500; DN 200 | I: above the 5000 line up to PS 500 bar · II: above 500 bar |
Categories and their conformity assessment modules
| Category | Modules (Annex II, point 1) | Notified body |
|---|---|---|
| I | Module A — internal production control | No |
| II | Modules A2, D1 or E1 | Yes |
| III | B (design type) + D, B (design type) + F, B (production type) + E, B (production type) + C2, or H | Yes |
| IV | B (production type) + D, B (production type) + F, G, or H1 | Yes |
A manufacturer may always choose a procedure from a higher category than the minimum one (Article 14(3)). From category II upward a notified body is involved and its number appears beside the CE marking.
Exceptions that move equipment up a category
- Unstable gas (Tables 1 and 6): a vessel or piping that would land in category I or II is classified in category III.
- Portable extinguishers and breathing-apparatus bottles (Table 2): classified at least in category III.
- Pressure cookers (Table 5): the design is subject to a conformity assessment procedure equivalent to at least one of the category III modules.
- Piping above 350 °C (Table 7): piping that would land in category II is classified in category III.
- Safety accessories: category IV by default, but a safety accessory made for specific equipment may take the category of the equipment it protects.
- Pressure accessories: classified on their own PS, V or DN and fluid group using the vessel or piping table; where both V and DN are appropriate, the highest category applies.
- Multi-chamber vessels: each chamber is classified separately and the vessel takes the highest category (Article 13(2)).
What this calculator does not do
It does not decide the fluid group for you — whether a fluid is group 1 depends on its classification as dangerous, including the flashpoint rule for a liquid above its flashpoint at the maximum allowable temperature. It does not cover assemblies, nor equipment excluded by Article 1(2) because another directive governs it. And it reads the tables, not your design: PS is the maximum allowable pressure set by the manufacturer, not the operating pressure, and V is the internal volume of the chamber including nozzles up to the first connection.
Not sure which route your equipment takes?
Category selection is the cheap part of a PED project; the design route and the technical file are where projects lose time. Tell us the equipment and we will respond within one business day.